Casa Branca
Almoçageme, Colares
Property Overview
A deep renovation of a residential villa in Almoçageme, Colares, comprising one main floor and a small mezzanine across four bedrooms. The existing house is divided into two distinct wings – one largely habitable, one in a state of partial ruin – each requiring a different approach. The client’s goal is to create a warm family home that opens up to the surrounding landscape and garden.
- Details
- 331m²
- Deep renovation
- Open plan living
- 4 bedrooms
- Scope
- Construction

The northern wing of the house is being substantially reconfigured – most internal walls removed to create an open-plan living, dining and kitchen area, with the remaining spaces reorganised to accommodate a guest bedroom with en-suite, laundry and technical areas. Structural reinforcements have been introduced alongside entirely new comfort systems, including underfloor heating and mechanical ventilation.
The southern wing was largely in ruins, with only the external walls, some internal walls and floor slab remaining. Works included the complete removal of remaining internal partitions, reinforcement of the foundations and construction of a new traditional timber and Portuguese-tile roof. The wing has been reorganised to create three bedrooms, two bathrooms and a guest WC, with the same comfort systems throughout. Electrical, water supply and drainage installations were completely renewed across both wings, and all windows replaced with new aluminium frames.
The project uses a deliberately simple material palette. Concrete flooring defines the communal areas while timber flooring creates a warmer atmosphere in the bedrooms and bedroom corridor. Carefully selected natural stones add character to the kitchen and bathroom worktops. Large window openings make the most of the property’s views over the surrounding forest and toward the sea, creating a strong relationship between the house, garden and landscape.
The project presented an unusual planning challenge – works began while the licensing process was still ongoing, requiring a phased approach that restricted initial works to what could legally progress internally, while the reconstruction of the southern wing was prepared. Connecting the two wings structurally and coordinating two effectively distinct construction stages demanded a high level of planning and programme management, reinforced by the close and continuous involvement of the clients throughout.